Finley Solar Farm
35°38′59″S 145°30′24″E / 35.6498°S 145.5067°E / -35.6498; 145.5067
- November 2018
- 2019
- 170 million A$
- John Laing Group
- Standard PV
- 133 MW
[edit on Wikidata]
Finley Solar Farm is a photovoltaic power station near Finley in New South Wales, Australia. It was developed at a cost of A$170 million by ESCO Pacific in 2019 and built and commissioned by Signal Energy Australia Pty Ltd.[1] ESCO sold the project to John Laing Group on 12 November 2018 at the same time as Westpac and ANZ Banks committed to the debt funding for the development.[2]
The solar farm has a seven-year power purchase agreement to supply electricity to BlueScope.[3]
References
- ^ "Finley Solar Farm". ESCO Pacific. Archived from the original on 29 September 2019. Retrieved 26 September 2019.
- ^ "John Laing acquires the 174.9 MWp Finley Solar Farm (NSW) from ESCO Pacific" (Press release). ESCO Pacific. 12 November 2018. Retrieved 26 September 2019.
- ^ Vorrath, Sophie (7 August 2019). "Finley solar farm starts sending power to NSW grid". Renew Economy. Retrieved 26 September 2019.
- v
- t
- e
- Beryl
- Bomen
- Broken Hill
- Coleambally
- Darlington Point
- Finley
- Griffith
- Gullen Range
- Limondale
- Manildra
- Moree
- Nevertire
- Nyngan
- Parkes
- Sunraysia
- White Cliffs (1982–2004)
- White Rock
- Barcaldine
- Childers
- Clare
- Clermont
- Cloncurry (cancelled)
- Collinsville
- Darling Downs
- Daydream
- Dunblane
- Emerald
- Hamilton
- Haughton
- Hayman
- Hughenden
- Kennedy
- Kidston
- Lakeland
- Lilyvale
- Longreach
- Lower Wonga
- Oakey
- Ross River
- Rugby Run
- Sun Metals
- Susan River
- Sunshine Coast
- Whitsunday
- Windorah (off-grid)
- Aurora (cancelled)
- Bungala
- Coober Pedy (off grid)
- Morgan Whyalla pipeline
- Riverland Solar Storage (cancelled)
- Solar River Project
- Sundrop Farms
- Tailem Bend